Deployments With the Numbers Left In
- Capacity and configuration stated, not implied
- Region and application named
- The constraint that shaped the design, not just the result
- Reference calls arranged where the client agrees
What every entry has to state
Where a client will not permit a detail to be published, we mark it as withheld rather than replace it with a vague adjective. A blank is honest; a superlative is not.
- Total capacity in kWh and power in kW
- Battery model, configuration and unit count
- Inverter or PCS make and model
- Country, site type and commissioning year
- The constraint that shaped the design
- How the system reached site and was installed
- What we would specify differently next time
Find a project that resembles yours
Project records
[XXX] kWh
[The constraint: what the site could not do before, and why. One or two sentences. State the demand charge, the outage exposure or the grid limit in numbers.]
| Capacity | [XXX] kWh |
| Power | [XXX] kW |
| Configuration | [N] × [model] |
| PCS | [make and model] |
| Commissioned | [Year] |
[XX] kWh
[The constraint: outage frequency, tariff structure, roof capacity, installation space limits. Quantify it.]
| Capacity | [XX] kWh |
| Configuration | [N] × [model] |
| Inverter | [make and model] |
| Installation | [Indoor / plant room / garage] |
| Commissioned | [Year] |
[XX] kWh
[The constraint: grid reliability, ambient temperature extremes, access cost per site visit, autonomy requirement.]
| Capacity per site | [XX] kWh |
| Sites | [N] |
| Configuration | [N] × [model] |
| Monitoring | [RS485 / remote] |
| Commissioned | [Year] |
[XX] kWh
[The constraint: diesel dependency and cost, fuel logistics, noise, generator run hours.]
| Capacity | [XX] kWh |
| Configuration | [N] × [model] |
| Charging source | [Solar kWp / generator / shore] |
| Environment | [IP rating and temperature range] |
| Commissioned | [Year] |
[Volume]
[The constraint: launch timeline, certification scope for the target market, branding depth, first-order volume.]
| Programme | [OEM Tier 1 / 2 / 3] |
| Platform | [model] |
| Markets | [destination markets] |
| Certification | [scope supplied] |
| First shipment | [Year] |
[XXX] kWh
[The constraint: self-consumption ratio, export limits, demand charge, backup requirement for critical loads.]
| Capacity | [XXX] kWh |
| Power | [XXX] kW |
| Configuration | [N] × [model] |
| Strategy | [Peak shaving / self-consumption] |
| Commissioned | [Year] |
More project records are available under NDA, including load profiles, commissioning reports and performance data. Tell us the application and scale you are specifying and we will send the closest matches.
What a complete project record looks like
The requirement
The sizing decision
The system as built
Delivery and installation
Results and what we learned
What we publish, and what we will not
Published by default
- Capacity, power rating and configuration
- Country or region, and site type
- Application and operating strategy
- Inverter or PCS model, where relevant
- Commissioning year
- Technical constraints and how they were resolved
Only with written consent
- Client company name
- Exact site address or coordinates
- Commercial terms, pricing or contract value
- Load profile data and metered consumption
- Photographs identifying the client or premises
- Any detail on a private-label programme
Ask our customers, not us
What to ask a reference
- Did batch five match batch one?
- How were component changes communicated?
- What was the RMA turnaround when a unit failed?
- Did the documentation match the shipment?
- Was the quoted lead time met?
- Would you place a repeat order?